Regional Connector
   HOME

TheInfoList



OR:

The Regional Connector Transit Project is a transit project currently constructing a light rail
tunnel A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube cons ...
for the
Los Angeles Metro Rail The Los Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California, United States. It consists of seven lines, including five light rail lines (the A Line (Los Angeles Metro), A, C Line (Los Angeles Metro), C, E Li ...
system in
Downtown Los Angeles Downtown Los Angeles (DTLA) contains the central business district of Los Angeles. In addition, it contains a diverse residential area of some 85,000 people, and covers . A 2013 study found that the district is home to over 500,000 jobs. It is ...
. It is designed to connect the A Line and E Line, which currently end at
7th Street/Metro Center station 7th Street/Metro Center station is an underground light rail and rapid transit (known locally as a subway) station on the A, B, D, and E lines of the Los Angeles Metro Rail system. The station also has street level stops for the J Line of ...
, to the existing L Line and
Union Station A union station (also known as a union terminal, a joint station in Europe, and a joint-use station in Japan) is a railway station at which the tracks and facilities are shared by two or more separate railway companies, allowing passengers to ...
. When completed, the project will provide a one-seat ride into the core of Downtown for passengers on those lines who currently need to transfer, and it will reduce or eliminate transfers for many passengers traveling across the region via Downtown. The project is being implemented by the
Los Angeles County Metropolitan Transportation Authority The Los Angeles County Metropolitan Transportation Authority (LACMTA), commonly branded as Metro, LA Metro, and L.A. Metro, is the state agency that plans, operates, and coordinates funding for most of the transportation system in Los Angele ...
(Metro). It has been given high priority by Metro in its long-range plan and has funding set aside in
Measure R Measure R was a ballot measure during the November 2008 elections in Los Angeles County, California, that proposed a half-cent sales taxes increase on each dollar of taxable sales (originating in or made from Los Angeles County) for thirty years ...
. The draft environmental impact statement was completed in September 2010, selection of a preferred alternative was completed in late October 2010, and the Final Environmental Impact Report was certified on April 26, 2012. Pre-construction on the project began in December 2012. The contract for heavy construction on the project was signed on July 9, 2014, and its official groundbreaking was held on September 30, 2014. Originally scheduled to open in 2020 but delayed due to construction difficulties, the project is 90% completed as of April 2022 with train testing commencing and revenue service expected to start in early 2023.


Route

The project's tunnels begin at the north end of
7th Street/Metro Center station 7th Street/Metro Center station is an underground light rail and rapid transit (known locally as a subway) station on the A, B, D, and E lines of the Los Angeles Metro Rail system. The station also has street level stops for the J Line of ...
, the previous terminal built in the early 1990s, and continue north under Flower Street. The line turns to run under 2nd Street and dives below the
2nd Street Tunnel __NOTOC__ The 2nd Street Tunnel is a widely filmed and photographed tunnel on 2nd Street under Bunker Hill in Downtown Los Angeles, California. The ''Los Angeles Times'' described it as "the most recognizable city landmark most Americans have ...
and the B/D subway with clearances as low as . In Little Tokyo, the line turns off 2nd to serve the replacement underground
Little Tokyo/Arts District station Little Tokyo/Arts District station is an under construction underground light rail station on the Los Angeles Metro Rail system which will replace a former at-grade station with the same name. The former station was located on the east side o ...
before the routes split to their own surface portals, connecting to former L Line tracks.


Station listing

The project will include three stations. From northeast to southwest, the stations are: * Little Tokyo/Arts District, located at 1st Street and Central Avenue, which replaces the former above-ground station of the same name * Historic Broadway, located at 2nd Street and
Broadway Broadway may refer to: Theatre * Broadway Theatre (disambiguation) * Broadway theatre, theatrical productions in professional theatres near Broadway, Manhattan, New York City, U.S. ** Broadway (Manhattan), the street **Broadway Theatre (53rd Stree ...
* Grand Av Arts/Bunker Hill, located at 2nd Place and Hope Street At previous points during planning and construction, Little Tokyo/Arts District was referred to as 1st St/Central; Historic Broadway as
Los Angeles City Hall Los Angeles City Hall, completed in 1928, is the center of the government of the city of Los Angeles, California, and houses the mayor's office and the meeting chambers and offices of the Los Angeles City Council. It is located in the Civic Cente ...
or 2nd Street/Broadway; and Grand Av Arts/Bunker Hill as Bunker Hill or 2nd Place/Hope Street.


Planned service plan

Metro plans to discontinue the L Line and use parts of its route to reconfigure the A and E Lines into the following: Due to the restructuring of service, the A Line will become the longest light rail line in the world at , surpassing the Coast Tram in Belgium. It will become even longer upon completion of Phase 2B of the Gold Line Foothill Extension when it opens in early 2025.


Background

The connector was envisioned as early as 1984 when planning and building the Metro Blue Line and restudied with a through connection in the Pasadena Light Rail Corridor studies in 1989. LACMTA originally envisioned the Blue Line running through Downtown L.A. to Union Station and onward to
Pasadena Pasadena ( ) is a city in Los Angeles County, California, northeast of downtown Los Angeles. It is the most populous city and the primary cultural center of the San Gabriel Valley. Old Pasadena is the city's original commercial district. Its ...
with potential future lines to the northwest ( Burbank/
Glendale Glendale is the anglicised version of the Gaelic Gleann Dail, which means ''valley of fertile, low-lying arable land''. It may refer to: Places Australia * Glendale, New South Wales ** Stockland Glendale, a shopping centre *Glendale, Queensland, ...
) and to the south and west ( Exposition Park/
Santa Monica Santa Monica (; Spanish: ''Santa Mónica'') is a city in Los Angeles County, situated along Santa Monica Bay on California's South Coast. Santa Monica's 2020 U.S. Census population was 93,076. Santa Monica is a popular resort town, owing to ...
). The connector was not completed due to lack of funds and realignment of the Red Line Eastside Extension, which later became an extension of the Pasadena Gold Line (the Gold Line was renamed the L line in 2019). The connector was formally studied for the first time as a stand-alone project in a
Major Investment Study Major (commandant in certain jurisdictions) is a military rank of commissioned officer status, with corresponding ranks existing in many military forces throughout the world. When used unhyphenated and in conjunction with no other indicators ...
in 1992–1993, in preparation of the Long Range Transportation Plan. The project was revived in 2004, when LACMTA staff initiated a technical feasibility assessment for a potential regional connector. This study focused on conceptual methods to provide a regional connector and to alleviate potential operational constraints. The 2004 staff study looked at the potential alignments that would not be entirely underground, due to funding constraints from the voter-approved 1998 Prop A ban on local county subway funding. Most of the alignments were under Flower Street, surfacing between 5th Street and 1st Street and proceeding east to
Alameda Street Alameda Street is a major north-south thoroughfare in Los Angeles County, California. It is approximately 21 miles in length, running from Harry Bridges Boulevard in Wilmington; and through Carson, Compton, Lynwood, Watts, Florence-Graham, Hunti ...
, connecting to the Eastside light rail corridor (now part of the Metro L Line), and continuing either north toward
Union Station A union station (also known as a union terminal, a joint station in Europe, and a joint-use station in Japan) is a railway station at which the tracks and facilities are shared by two or more separate railway companies, allowing passengers to ...
and
Azusa Azusa may refer to: Relating to California From a Native American language, likely Tongva language, Tongva ''Asuksagna:'' *Azusa, California, a city in the United States *Azusa Pacific University, a Christian-based institution in Azusa, California ...
or east toward
East Los Angeles East Los Angeles ( es, Este de Los Ángeles), or East L.A., is an unincorporated area in Los Angeles County, California. As of the 2020 census it had a population of 118,786, a drop of 6.1% from 2010, when it was 126,496. For statistical purpo ...
. LACMTA staff analyzed at-grade street-running couplets, transit mall, elevated and hybrid subway/at-grade/elevated alignments along east-west streets such as
Temple Street A temple (from the Latin ) is a building reserved for spiritual rituals and activities such as prayer and sacrifice. Religions which erect temples include Christianity (whose temples are typically called church (building), churches), Hindui ...
, First Street, Second Street and Third Street and utilizing available grade-separated infrastructure such as the Second Street Tunnel through Bunker Hill (between Hill and Figueroa Streets) or the Third Street Tunnel (between Hill and Flower Streets) to minimize costs, improve operating times and improve the feasibility of constructing the project. In July 2006, the LACMTA Board voted to approve funding and staff to initiate a Major Investment Study (MIS) for the Regional Connector in conjunction with approval of a similar study for the extension of the Red Line subway. In June 2007, the LACMTA Board approved the consultants to perform the Alternative Analysis and MIS, and in July 2007 the Alternatives Analysis was initiated. In November 2007, preliminary outreach meetings for the Alternative Analysis were held at Central Library and the
Japanese American National Museum The is located in Los Angeles, California, and dedicated to preserving the history and culture of Japanese Americans. Founded in 1992, it is located in the Little Tokyo area near downtown. The museum is an affiliate within the Smithsonian Affil ...
(JANM). The results from these meetings were presented to the public in February 2008, including the descriptions of the eight route alternatives identified for analysis, narrowed down to two later in 2008. At the January 2009 Metro Board Meeting, the Regional Connector was approved and received funding to continue in the environmental study process (Draft EIS/EIR).


Environmental review process

The Alternatives Analysis yielded two LRT ( light rail) build alternatives, plus the required "No Build" and "TSM" ( Transportation System Management) options. A third LRT build alternative was added in February 2010, at the request of Little Tokyo stakeholders (including property, business, and homeowners). The operational intent of the project is to allow through running of service between the four corridors (Blue Line corridor, Expo corridor, Gold Pasadena corridor, and Gold Eastside corridor). All three build alternatives begin at the 7th St/Metro Center station, which is currently the northern terminus of the Blue Line and the eastern terminus of the Expo Line which opened on April 28, 2012. All three build alternatives connect to the existing Gold Line at
Alameda Street Alameda Street is a major north-south thoroughfare in Los Angeles County, California. It is approximately 21 miles in length, running from Harry Bridges Boulevard in Wilmington; and through Carson, Compton, Lynwood, Watts, Florence-Graham, Hunti ...
near
Temple A temple (from the Latin ) is a building reserved for spiritual rituals and activities such as prayer and sacrifice. Religions which erect temples include Christianity (whose temples are typically called churches), Hinduism (whose temples ...
Street or 1st Street. On October 28, 2010, the LACMTA Board of Directors opted for a fully underground option, rejecting at-grade and underground emphasis alternatives. This route remains underground below Flower and 2nd Streets until northwest of 1st/Alameda. By that point, the route would have split into two branches. Each branch would then emerge from a tunnel - one heading north to Union Station, the other east to the Eastside. Metro added this alignment in February 2010, after receiving public input on the other two options. This option puts the connector underground beneath 1st/Alameda. The fourth new station (at 1st/Alameda southwest block) would replace the existing Little Tokyo/Arts District station. The third station (nearest the
Civic Center A civic center or civic centre is a prominent land area within a community that is constructed to be its focal point or center. It usually contains one or more dominant public buildings, which may also include a government building. Recently, the ...
) was shifted slightly west toward
Broadway Broadway may refer to: Theatre * Broadway Theatre (disambiguation) * Broadway theatre, theatrical productions in professional theatres near Broadway, Manhattan, New York City, U.S. ** Broadway (Manhattan), the street **Broadway Theatre (53rd Stree ...
, to take advantage of redevelopment efforts in the historic core. This option is generally fastest and has fewest impacts during operations, but it would have more construction impacts and higher costs.


Comparison of alternatives

The following table summarizes key characteristics of each alternative:


Selected Alternative: LRT 3

In September 2010, Metro published the Draft Environmental Impact Statement/ Environmental Impact Report (Draft EIS/EIR). The report recommended adoption of the "Fully Underground LRT Alternative" (LRT 3 above). In October 2010, Metro staff reaffirmed this recommendation, but with the 5th/Flower station removed. The report cited concerns for the overall project cost and the proposed station's short distance from Metro Center/7th Street Station, a mere three blocks, which might not have met FTA funding standards. However, proponents of a 5th/Flower station cited the high density of very large high-rise office buildings within one block of a 5th/Flower station and that such a station would relieve what is expected to be extreme pressure at Metro Center/7th Street (already experiencing pressure) once the Expo Line, then the Regional Connector are complete. At the Metro Board meeting in late October 2010, the Board certified the Draft EIS/EIR and accepted the staff recommendation of Fully Underground Alternative with the 5th/Flower station deleted as the Locally Preferred Alternative (LPA). The project staff will now conduct a final study of the LPA, which will culminate in a Final Environmental Impact Study/Environmental Impact Report (Final EIS/EIR).


Project funding

Measure R Measure R was a ballot measure during the November 2008 elections in Los Angeles County, California, that proposed a half-cent sales taxes increase on each dollar of taxable sales (originating in or made from Los Angeles County) for thirty years ...
guarantees the Regional Connector $160 million for implementation. In February 2014, the federal government granted Metro $670 million in New Starts funds and $160 million in infrastructure loans for the project.


Construction

Pre-construction activities began in December 2012, with the start of the relocation of utility pipes. Major heavy construction was scheduled to begin in 2013, but was delayed by lawsuits, among other factors. The main contractor was finally issued a "Notice to Proceed" in early July 2014; the official groundbreaking for heavy construction on the project was held on September 30, 2014. Most sections of the Regional Connector tunnel will be built using the
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore throu ...
(TBM) construction method, though some sections (especially the locations of the three future subway rail stations) will be built using the
cut-and-cover A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube constr ...
construction method with an emphasis on maintaining as much road access as possible during construction. Metro has an agreement with the
Los Angeles Music Center The Music Center (officially named the Performing Arts Center of Los Angeles County) is one of the largest performing arts centers in the United States. Located in downtown Los Angeles, The Music Center is composed of the Dorothy Chandler Pavilion ...
to use the most advanced state of the art noise-suppression measures underneath 2nd Street where it passes
Walt Disney Concert Hall The Walt Disney Concert Hall at 111 South Grand Avenue in downtown Los Angeles, California, is the fourth hall of the Los Angeles Music Center and was designed by Frank Gehry. It was opened on October 24, 2003. Bounded by Hope Street, Grand Ave ...
and the Colburn School of Music. This commits Metro to use procedures to ensure that the rumble of trains does not intrude on the sound quality of recordings made in the venues or mar audiences' musical experience within this sensitive stretch of the tunnel. Two modest, one-story brick buildings had to be demolished since the
Little Tokyo/Arts District station Little Tokyo/Arts District station is an under construction underground light rail station on the Los Angeles Metro Rail system which will replace a former at-grade station with the same name. The former station was located on the east side o ...
will be moved underground and across the street. One of the structures existed since at least 1898 and both played an important role in the cultural life of the Little Tokyo neighborhood for decades. By late 2017, one of the two tunnels had been completed; the second tunnel was completed in January 2018. Extra work and expense were required to work around century-old water and electric infrastructure beneath downtown Los Angeles. Metro has revised its estimate for the project completion to mid 2022, more than a year after the original estimated completion date. In 2020, due to the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identif ...
and the subsequent state-mandated closings of local businesses and stay-at-home orders that resulted in reduced traffic, the city of Los Angeles was able to shut down local roads, allowing Metro to accelerate construction. According to an independent monitoring report released by Metro in March 2020, at the current pace revenue service on the Regional Connector would begin in August 2022. In April 2022, Metro completed all trackwork as well as station platforms and system guideways with a planned opening date sometime in early 2023. The final part of work includes station plaza, street restoration, and fencing construction.


See also

*
K Line is a Japanese transportation company. It owns a fleet that includes dry cargo ships (bulk carriers), container ships, liquefied natural gas carriers, Ro-Ro ships, tankers, and container terminals. It used to be the fourteenth largest contai ...
*
Purple Line Extension The Purple Line Extension, formerly known as the Westside Subway Extension and the Subway to the Sea, is a new heavy-rail subway corridor in Los Angeles County, California, extending the D Line (Purple Line) from its current terminus at in Kor ...
*Other rail tunnels connecting previously disjointed systems **
Center City Commuter Connection 250px, The ASCE plaque in Jefferson Station 250px, City plaque in Jefferson Station The Center City Commuter Connection, (CCCC) commonly referred to as "the commuter tunnel", is a passenger railroad tunnel in Center City, Philadelphia, Penns ...
(Philadelphia) **
Oslo Tunnel The Oslo Tunnel ( no, Oslotunnelen) is a , double-track, railway tunnel which runs between Olav Kyrres plass and Oslo Central Station (Oslo S) in Oslo, Norway. The tunnel constitutes the easternmost section of the Drammen Line and runs bel ...
*Comparable light rail tunnels intended for capacity increases downtown **
D2 Subway D2 Subway is a proposed expansion of the DART Light Rail DART Light Rail is the light rail system serving the metropolitan area of Dallas, Texas and is owned and operated by Dallas Area Rapid Transit (DART). The DART Light Rail system opene ...
** Kombilösung Karlsruhe


References


External links


Regional Connector Transit Project – official Metro website

Los Angeles County Metropolitan Transportation Authority

City of Los Angeles Office of the Mayor
{{Los Angeles County Metropolitan Transportation Authority Los Angeles Metro Rail projects Proposed railway lines in California Tram and light rail transit systems under construction 2023 in rail transport Railroad tunnels in California